Project Plan Marketplace

Project Plan Marketplace

36 Products

Browse our full library of ag and shop project plans, built for classroom and shop use by real ag teachers. Every plan in this collection includes detailed drawings, complete material lists, and step-by-step build instructions — everything you need to run a project from first cut to final inspection.

These aren't generic templates. Each project plan is created by experienced ag educators and industry professionals who understand what actually works in a school shop: realistic material costs, safety considerations, and skill levels appropriate for FFA and ag mechanics classes. Whether you're planning your first welding project or looking to expand an established shop curriculum, you'll find ready-to-build plans that save prep time and help students build real, transferable shop skills.

New project plans are added regularly, with options for beginner through advanced skill levels across welding, woodworking, and general ag mechanics builds.

Have project plans of your own? Join our Contributor Program and start earning by sharing what works in your shop with ag teachers nationwide.

4" Rocket Stove DXF & Blueprints
KB Metal Designs
4" Rocket Stove DXF & Blueprints
$15.00
Charcoal Chimney DXF & Blueprints
KB Metal Designs
Charcoal Chimney DXF & Blueprints
$8.00
Basic Hexagon Fire Pit DXF & Blueprints
KB Metal Designs
Basic Hexagon Fire Pit DXF & Blueprints
$12.00
American Flag Picnic Table DXF & Blueprints
KB Metal Designs
American Flag Picnic Table DXF & Blueprints
$12.00
Santa Maria Grill DXF & Blueprints
KB Metal Designs
Santa Maria Grill DXF & Blueprints
$20.00
Indoor Texas Firewood Rack DXF & Blueprints
KB Metal Designs
Indoor Texas Firewood Rack DXF & Blueprints
$8.00
Cabinet Smoker DXF & Blueprints
KB Metal Designs
Cabinet Smoker DXF & Blueprints
$20.00
Argentina Santa Maria Grill DXF & Blueprints
KB Metal Designs
Argentina Santa Maria Grill DXF & Blueprints
$20.00
American Flag Firewood Rack DXF & Blueprints
KB Metal Designs
American Flag Firewood Rack DXF & Blueprints
$8.00
American Flag Bench DXF & Blueprints
KB Metal Designs
American Flag Bench DXF & Blueprints
$12.00
Cactus Pen Holder — Welding & Metal Fabrication Project Plans (1½" & 2" Steel Tubing) | TEKS-Aligned Ag Mechanics Lesson
TradeCraft Educational Services
Cactus Pen Holder — Welding & Metal Fabrication Project Plans (1½" & 2" Steel Tubing) | TEKS-Aligned Ag Mechanics Lesson
$8.00
Texas Picnic Table DXF & Blueprints
KB Metal Designs
Texas Picnic Table DXF & Blueprints
$12.00
Swinging Picnic Table DXF & Blueprints
KB Metal Designs
Swinging Picnic Table DXF & Blueprints
$12.00
Buck - Square Fire Pit DXF & Blueprints
KB Metal Designs
Buck - Square Fire Pit DXF & Blueprints
$12.00
Bench Swing DXF & Blueprints
KB Metal Designs
Bench Swing DXF & Blueprints
$12.00
14" Christmas Tree — Cedar Fence Picket Woodworking Project Plans (Single Class Period Build)
TradeCraft Educational Services
14" Christmas Tree — Cedar Fence Picket Woodworking Project Plans (Single Class Period Build)
$7.99
6-Sided Santa Maria Grill with Removable Grill Top — Classroom Steel Fabrication Project (DXF + Build Instructions + Lesson Plan + Rubric)
TradeCraft Educational Services
6-Sided Santa Maria Grill with Removable Grill Top — Classroom Steel Fabrication Project (DXF + Build Instructions + Lesson Plan + Rubric)
$24.99
Jackson Bench — Classroom Steel Fabrication Project Plans (DXF + Build Instructions + Lesson Plan + Rubric)
TradeCraft Educational Services
Jackson Bench — Classroom Steel Fabrication Project Plans (DXF + Build Instructions + Lesson Plan + Rubric)
$19.99
Welding Table DXF & Blueprints
KB Metal Designs
Welding Table DXF & Blueprints
$12.00
4-Drill & Driver Wall Storage Rack Project Bundle (Digital Download)
TradeCraft Educational Services
4-Drill & Driver Wall Storage Rack Project Bundle (Digital Download)
$11.00
Basic Octagon Fire Pit DXF & Blueprints
KB Metal Designs
Basic Octagon Fire Pit DXF & Blueprints
$12.00
Steel Shooting Bench
Micah Fry Designs
Steel Shooting Bench
$5.00
Pen / Card Holder Intro Project | Metal Fabrication Shop Project
TradeCraft Educational Services
Pen / Card Holder Intro Project | Metal Fabrication Shop Project
$7.00
Tool Caddy Project Bundle — Woodworking & Ag Mechanics Project Plans (6" × 18")
TradeCraft Educational Services
Tool Caddy Project Bundle — Woodworking & Ag Mechanics Project Plans (6" × 18")
$9.99
← Previous 1 2 Next →
Have resources to contribute? Join our marketplace and earn up to 70% of every sale by sharing your lesson plans, DXF files, or project plans.
Become a Contributor