Designed by TradeCraft
Contributor
Designed by TradeCraft
Shop More Products
→
Wall Pit Project Plan Bundle | Advanced Modular Cooking System Fabrication Project
Wall Pit Project Plan Bundle | Advanced Modular Cooking System Fabrication Project
Modular steel wall pit cooking system with removable grill surfaces and mounting rails
Wall Pit Project Plan Bundle | Advanced Modular Cooking System Fabrication Project
Wall Pit Project Plan Bundle | Advanced Modular Cooking System Fabrication Project
Wall Pit Project Plan Bundle | Advanced Modular Cooking System Fabrication Project
Wall Pit Project Plan Bundle | Advanced Modular Cooking System Fabrication Project
Project Plan

Wall Pit Project Plan Bundle | Advanced Modular Cooking System Fabrication Project

$32.99
Quantity
Added to cart!

📦 Instant digital download • DXF + PDF files • Licensed for classroom/personal use, not for resale

Challenge advanced welding and fabrication students with this Wall Pit Project Plan Bundle. This project guides students through building a complete modular wall-mounted cooking system with a CNC-cut wall plate, dual vertical mounting rails, removable grill surfaces, a side tray, and a bottom plate. Students fabricate multiple welded components that hang and function together as one complete system.

Designed for Agricultural Mechanics, Welding, Metal Fabrication, CTE, and advanced shop programs, this project reinforces layout, CNC plasma cutting, MIG welding, grinding, fabrication fit-up, modular design, and component alignment. Estimated build time is 4–6 class periods.

What's Included

  • Printable Wall Pit project instructions
  • 8-sheet fabrication drawing packet
  • Complete cut list and material requirements
  • Tool and safety checklist
  • Step-by-step fabrication procedure
  • Student check points throughout the project
  • Cleanup expectations
  • Reflection / exit ticket
  • Printable rubric
  • DXF file included: Wall_Pit_All.dxf

Project Skills Covered

Students will practice:

  • Reading multi-sheet fabrication drawings
  • CNC plasma cutting wall plate and rail components
  • Cutting 1" × 1" and 2" × 2" angle parts
  • Cutting 45° frame corners
  • Building rectangular grill and tray frames
  • Installing expanded metal cooking surfaces
  • Welding pivots, hooks, rails, and modular components
  • Checking square, rail spacing, alignment, and fit-up
  • Grinding and finishing a multi-part welded project

Materials Used

This project uses 3/16" steel plate, 1" × 1" angle or square tubing, 2" × 2" angle, expanded metal, and ½" round bar. The instructions list approximately 32" × 61" of steel plate, 200 inches of 1" × 1" material, 110 inches of 2" × 2" angle, 1000 square inches of expanded metal, and 10 inches of ½" round bar.

Drawing Details

The drawing packet includes the full Wall Pit assembly, labeled part callouts, wall plate layout, vertical rail design, a 29" × 18" grill, a 29" × 10" grill, bottom plate details, and a removable side tray. The plans also show expanded metal sizing, rail geometry, hanger details, and modular fit-up references.

Perfect For

This project is ideal for advanced students who are ready for a larger, multi-component fabrication challenge. The Wall Pit requires accurate cutting, clean weld sequencing, square frame construction, and careful alignment so each removable part hangs properly on the wall-mounted rail system.

Digital download only. No physical product will be shipped. DXF file included.

✦ Built by Ag Teachers
✦ FFA-Chapter Ready
✦ Secure Checkout

Related products