Designed by TradeCraft
Contributor
Designed by TradeCraft
Shop More Products
Quinn Bar Top Table Project Plans
Lonestar Blueprint

Quinn Bar Top Table Project Plans

$25.00

Quinn Bar Top Table

Product Number TC03

The Quinn Bar Top Table project is a full-scale fabrication build designed for classroom instruction. Measuring approximately 66” x 27” x 42”, this project challenges students to apply precision fabrication techniques while constructing a sleek, elevated table suitable for both indoor and outdoor use.

Project Highlights:

  • Comprehensive Skill Application – Reinforces accurate measuring, layout, plasma cutting, fit-up, and MIG/TIG welding techniques.

  • Angular Fabrication Practice – Exposes students to complex angles, bevels, and precision alignment.

  • Tabletop Mounting System – Includes plate mounts and threaded levelers for a clean, professional finish.

  • Mid-Scale Assembly – Promotes teamwork and careful sequencing while maintaining structural balance.

  • Functional End Product – The finished bar top table is both stylish and practical, ideal for classrooms, patios, or event setups.

Included in this Package:

  • Detailed Plans

  • DXF Cut Files (ready for CNC plasma cutting)

  • Cut List

  • Tools & Materials Used

  • Notes Sheet

This project is ideal for agricultural mechanics or welding courses, providing both instruction and a product students can showcase or sell.

Quantity
✓ Added to cart successfully!
Built by Ag Teachers
FFA-Chapter Ready
Secure Checkout